We have been busy the past doing the electrical, pluming and heating. I have forgot from the last house we built how time consuming this is. We have spent some very long hard day's over at the house this past week trying to get it all done as we have drywall coming today. So now things will really start to change.
Insulating all done |
Front Door In |
Front Window's going in with the help of Caleb and Delbert Bevans and the siding has also been removed. |
Do you notice how the young guy's are inside on a solid floor and Delbert Bevans who is the oldest is outside on a skinny plank. |
Back Window's in and most of the siding gone. |
Old ceiling have been redone |
The ceilings in the living room and kitchen have been patched where there used to be walls |
Cabinet in the master closet beside the fireplace. Instead of having a waisted space we decided to build this cabinet to store the vacuum hose in for the bedroom. |
Fireplace in the master bedroom |
Removed the tile in front of the tub of the main bathroom. This will make it easier to find new flooring. It has been hard to find flooring to match the tile and the marble tub. |
Brett and Brady putting up the vapour barrier. |
No comments:
Post a Comment